Environmental Engineering Solutions

It seems today that any type of new construction whether it be in the land development market or the mining market, dealing with building codes or MSHA, some form of Environmental Engineering is required by the governing agency. CBC Engineers & Associates, Ltd. started our Environmental Engineering Division with the strategic employment of Ed Galaska back in 2001. Since then CBC has formed a department around Ed and we get calls from land developers and coal mines alike. Our ability to handle a wide range of Environmental issues and have the other engineering disciplines to go along with the Environmental Solutions, allows us to package Clients needs and save money in the process. As you will see on the following case studies we have been involved in Environmental Site Assessments (ESA) both ASTM - Phase I & II, Ground & well water monitoring and testing, Asbestos and lead paint surveys, Analytical Chemistry Testing of Soil & Water and even FAA Environmental "Due Diligence Audits", Noise Studies as well as NEPA Studies & SHPD Reviews.

CBC is a one stop shop for all of your Environmental Engineering Needs. Should you have a need or are starting a land development or tearing down an existing structure call our Director of Environmental & Land Development Services - Ed Galaska @ 937-428-6150.

Site Restoration - Ohio National Guard - Blue Ash, Ohio

It seemed like a normal removal & closure of a "Leachfield" and Septic Tank followed by a site restoration at the Air National Guard Station location in Blue Ash (Hamilton County), Ohio. This work was proposed to be performed by CBC Engineers & Associates, Ltd. in August of 2004. The work was to be performed in accordance with specified Ohio EPA, Ohio Health Department and Ohio Air National Guard requirements. All contaminated soil and Septic Tank system was to be removed and the site restored using imported quality soils to replace the poor soil hauled away. However, more was revealed when the contaminated soil was hauled away.
View a Printable Version Here

View Case Study Details

CBC Aids The City of Huber Heights with an ASTM - Phase II Site Assessment

CBC Engineers & Associates, Ltd. was asked to assist the Huber Heights City Schools Board of Education with examining the construction site of their new Elementary School. The school location was to be on the former Standpipe Park Property in Huber Heights, Miami County, Ohio. During preliminary construction activities on the site, a landfill area was discovered that had not been known to the site design engineer or the city. CBC performed an ASTM - Phase II environmental assessment of the underlying soils and ground water to ensure there was no impact from the land fill.
View a Printable Version Here

View Case Study Details

Sound Intensity Survey - Beavercreek, Ohio

A proposed single-family housing development was being considered in 2002 which had Interstate 675 as its northern most boundary to the property being considered. The developer of the project was concerned about the noise levels that Interstate 675 would pose on his new development and the owners of the new homes that be built. For this reason, CBC Engineers & Associates, Ltd. were retained to perform a Sound Intensity Survey on the subject property to determine the effect if any the vehicle noise from the interstate will have on the proposed subdivision, as well as to propose insight into possible abatement measures if needed.
View a Printable Version Here